top of page

Long Beach Water Department (LBWD) - S-18 Sewer Lift Station Rehabilitation Design and Construction Management Services 

Design, project management, and construction engineering support services for replacing/upgrading four 14-hp dry pit submersible pumps, odor control equipment, installation of new lining to the wet well and electrical gear (motor control center, programmable logic controller control system, wet well mixing system, stand by generator).  Reviewed submittals and RFIs. Record drawing preparation, full time construction inspection, and coordination of shutdown and start-up of the lift station. 

Long Beach Water Department (LBWD) - North Sewer Lining Design and Construction Management Services 

Design, construction management and inspection services for the rehabilitation of 5,800 lineal feet of sewer pipe; CCTV inspections, cleaning and lining 8-inch, 10-inch, and 12-inch pipe, point repairs, removing and replacing sections of existing 8-inch, 10-inch, and 18-inch sewers, restoring existing sewer laterals and manhole channels, temporary sewer bypass facilities, traffic control, and potholing utilities. 

bottom of page